Factors to consider before selecting a pre engineered steel building

July 21st, 2009 admin No comments

The use of pre engineered steel buildings in the commercial as well as residential sector is increasing day by day. Some of the main reasons for this popularity are the low cost of construction, reduction in the time taken for the construction, environment friendly construction etc. However, there are a few factors to consider before selecting a pre engineered building to extract the maximum benefits out of it and to ensure long durability.

1) Legal formalities : Although pre engineered buildings are easy to construct and take a much lesser time to be erected at the construction site, yet there are a few legal formalities that have to be take care of. The building should be of an authorized design and should comply with all legal norms like fire safety, electric norms, etc. All these legal formalities should be complied with while designing and constructing pre engineered steel buildings, in order to get approval from the government.

2) Monetary factors: It is essential to carefully study the total expenditure estimate provided by the steel building supplier in order to check for any discrepancies. As a buyer, you should compare the expenditure estimates provided by different suppliers, so that the best deal could be selected. However, price should not be the only consideration while selecting a steel building supplier. If the same deal is offered at different prices by different suppliers, then the reason for such a discrepancy should be analyzed. It is not advisable to compromise on quality for a lower price.

3) Quality of material used: The most crucial component of a pre engineered building is the quality of material used in the construction activity. Steel is the main construction material used in a prefabricated steel buildings. Therefore it is essential that the best quality steel is used, to ensure maximum effectiveness and durability. Other materials such as insulation panels, flooring material, electrical components, etc should also be of high quality for proper effectiveness.

4) Construction time: Although the construction time for pre engineered steel buildings is comparatively lesser than that of conventional buildings, yet different steel building supplier offer different construction time. Generally the whole process of fabricating and erection takes around 60-90 days. This time span should be clearly discussed before finalizing the project to avoid any ambiguity in the future.

These are some of the essential points to consider and clarify with the supplier before going in for pre engineered steel buildings to maximize the effectiveness of the building and avoid any confusion in the future.

Benefits of using pre engineered steel buildings

July 3rd, 2009 admin No comments

Construction activities worldwide are increasing at a tremendous pace, and so are the costs related with constructing a structure. Pre engineered buildings are an excellent solution to the numerous complications related to constructing in the traditional way. Pre engineered steel buildings are the latest in the field of pre fabricated buildings, and they offer numerous benefits as compared to prefabricated buildings made of other metals. Some of the benefits are:

1) These prefab buildings are very environment friendly since steel is a recyclable metal and can be used over and over again. Thus after pre engineered steel buildings are demolished; the steel can be further utilized instead of lying in heaps and adding to environmental pollution.
2) Most of the pre engineered buildings built these days are based on the green concept, i.e. they are designed and built in such a way that they save maximum energy and have a minimal impact on the environment. Some of the features of a green building are energy efficiency, made up of an environment friendly material and offers a healthy and conducive indoor living environment.
3) Steel as a building material offers numerous benefits such as ease to build, easy to maintain, fire resistance, high durability and the ability to recycle. But it is important to choose a good quality steel building supplier so that the steel material used is of the best quality and offers all of the above mentioned benefits.
4) Pre engineered buildings are built with extreme precision and dimensional accuracy due to the fact that they are manufactured in-house and then assembled at the construction site. This precision and dimensional accuracy ensure maximum efficiency and proper utilization of space.
5) Although steel is an expensive metal, yet when the overall savings due to a steel building are considered, then it comes out to be a very cheap and affordable building material. By applying a special coating on steel, it can be made rust proof. Moreover it is insect and termite resistant and the maintenance cost associated with steel is much lower as compared to other benefits. A properly built building from a reputed steel building supplier is very durable and is resistant to extreme weather conditions.

A pre engineered steel building offers the above, and many more benefits to individuals and companies looking for an efficient and cost effective building solution. However, one word of caution for people who are not aware of the different types of prefab buildings available in the market. Some unscrupulous companies try to sell buildings that are most profitable to them. Therefore it is important to conduct a research on the types of buildings available and the reputation of the metal building supplier.