G.I. Deck and Mezzanine Floor

openweb_spantruss

The in-house, state of the art, C.N.C.- 47 stage Roll forming mill produces an intricate sections to offer economical yet highly functional floor deck system. This steel deck has a high load bearing capacity which makes it ideally suited for mezzanine floors in industries and warehouses, and as flooring in multi storey buildings. The steel deck does not require any further steel reinforcement. A functional and dry floor can be laid in a just a matter of hours.

Cold Steel Deck Section is fixed on welded plate girder primary and secondary beams. Average 60 mm thick concreting is done on it to ensure smooth
top surface. This ensures dry construction, fast speed and high strength.